
Check your CV before you apply
See your score the way hiring software reads it. If it needs work, build a stronger resume in the same place.
About the role
Nebius is hiring a Senior Data Center Construction Project Manager (remote, open to people in the United States). Nebius is leading a new era in cloud infrastructure for the global AI economy. We are building a full-stack AI cloud platform that supports developers and enterprises from data and model training through to production deployment, without the cost and complexity of building large in-house AI/ML infrastructure.
Key responsibilities
- This remote position will require travel between Data Centers
- Oversee all phases of data center construction, from design review to commissioning and handover
- Collaborate with architects, MEP consultants, contractors, and vendors to ensure project specifications and timelines are met
- Review design drawings and technical submittals for compliance with company standards and operational requirements
- Manage change control, progress tracking, and budget adherence throughout the project lifecycle
- Participate in Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) for key systems such as UPS, chillers, generators, and switchgear
- Serve as the primary liaison with local authorities, utilities, and regulatory bodies
- Ensure all permits, licenses, and inspections (e.g., building, fire, electrical, environmental) are completed on schedule
- Maintain compliance with local codes, safety standards, and data center industry best practices (e.g., ISO, Uptime Institute, TIA-942)
- Manage documentation and reporting for occupancy certification and operational approvals
About Nebius
Nebius is leading a new era in cloud infrastructure for the global AI economy. We are building a full-stack AI cloud platform that supports developers and enterprises from data and model training through to production deployment, without the cost and complexity of building large in-house AI/ML infrastructure.
Built by engineers, for engineers. From large-scale GPU orchestration to inference optimization, we own the hard problems across compute, storage, networking and applied AI.
Remote details
- Remote, open to people in the United States (remote role)
- This remote position will require travel between Data Centers
- Collaborate with architects, MEP consultants, contractors, and vendors to ensure project specifications and timelines are met
- Ensure all permits, licenses, and inspections (e.g., building, fire, electrical, environmental) are completed on schedule
- 5+ years of experience in construction project management, with a focus on data center or colocation infrastructure either for a general contractor, colocation provider, or hyperscaler
- Remote work reimbursement: Up to $85/month for mobile and internet
Salary and benefits
The posting states a base salary of USD 115,000 to 275,000 a year. Benefits and what the employer offers, as the posting lists them:
- Health insurance: 100% company-paid medical, dental and vision coverage for employees and families
- 401(k) plan: Up to 4% company match with immediate vesting
- Parental leave : 20 weeks paid for primary caregivers, 12 weeks for secondary caregivers
- Remote work reimbursement: Up to $85/month for mobile and internet
- Disability & life insurance: Company-paid short-term, long-term and life insurance coverage
- We offer competitive compensation and benefits packages. Actual compensation will be determined based on job-related factors, including experience, skills, qualifications, the level at which the candidate is hired, and geographic location, consistent with applicable law.
How to apply
Apply on the company's own site.

Source: Employer Career Pages · The Briefed never charges candidates.
Similar roles
More Construction & Architecture roles near this one